PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing ductwork at the 4th floor Facing South.jpg Installing sheating along the parapet of the High Roof Facing East.jpg Interior electrical at the 2nd floor Facing East (2).jpg Laying out block along 2nd floor column line H between 5-3.3 Facing East.jpg Storm piping at the High Roof.jpg
Previous page Storm piping at the High Roof
Storm piping at the High Roof